Consultancy

She has been involved in proof checking of several bridges in India including prestressed box girder bridges, prestressed T girder bridges, concrete steel composite bridges and arch type bridges as a PhD student at IIT Madras. The main projects are:

  • Proof checking of  Hyderabad metro rail bridge, Chennai metro rail bridge, Arch bridge in Calicut.
  • Involved in collapse investigation of a box girder bridge in Mumbai
  • Investigation of collapse of a 45m span curved box girder bridge in Himachal Pradesh
  • Proof checking of post-tensioned beams and slabs in the new Cochin international terminal and Kannur international airport
  • Investigation on structural cracking in a bridge pier cap using nonlinear finite element analysis and strut-and-tie method
  • Proof checking of second Iswar Setu-Kalyani extradosed bridge with 120m span over Hoogly river in Kolkata
  • Proof checking of tied arch bridge with 110m span at Kayamkulam